Customization: | Available |
---|---|
After-sales Service: | After Service |
Application: | Office |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Here are some photos
20ft Flat Pack Container House | |||||||
Main frame | Top beam frame | 3.0mm galvanized molding beam, galvanized content 80g/m, 180mm*5633mm*2pcs | |||||
3.0mm galvanized molding beam, galvanized content 80g/m², 180mm*2688mm*2pcs | |||||||
Galvanized several words 40*60*1.1mm beam, galvanized content 80g/m², 7pcs | |||||||
Galvanized mouth 20*20*1.1mm transverse support, galvanized content 80g/m², 2pcs | |||||||
Bottom beam frame, (roller beam) | 3.0mm galvanized molding beam, galvanized content 80g/m², 160mm*5633mm*2pcs | ||||||
3.0mm galvanized molding beam, galvanized content 80g/m², 160mm*2688mm*2pcs | |||||||
Galvanized several words 50*100*1.1mm beam, galvanized content 80g/m², 9pcs | |||||||
Water sink integrated piece, L5633mm, 2pcs | |||||||
Water sink integrated piece, L2688mm, 2pcs | |||||||
Upright | 3.0mm galvanized column, galvanized content 80g/m², 210mm*150mm*2535mm*4pcs | ||||||
Connecting parts 10mm, galvanized content 80g/m², 8pcs | |||||||
L-shaped column reinforcement, 8pcs | |||||||
Galvanized corner | Upper corner galvanized content 80g/m², 210*150*210mm*4pcs | ||||||
Bottom corner galvanized content 80g/m², 210*150*160mm*4pcs | |||||||
Single tile capping | 0.35mm color steel single tile, 360 degree bite, special waterproof method, 1set | ||||||
Damp-proof course | Moisture-proof film, PE resin film 1.0mm, 1set | ||||||
Roof insulation | Glass fiber cotton roll felt+aluminum foil, thickness 80mm, bulk weight 14kg/m³, 1set | ||||||
Colour | Polyethylene electrostatic powder ink spray painting process (white gray) does not change color for 5 years, 1set | ||||||
Bolt | Galvanized M12×40 high strength bolts, 48set | ||||||
Downspout | Downspout | PVC50# Downspout, 4pcs | |||||
Ceiling tile | Ceiling tile | 0.25mm, V831 color steel integrated ceiling, 1set | |||||
Ceiling tile folding pieces | Ceiling tile folding pieces | Ceiling tile homogeneous fold, 3set | |||||
Ground bearing |
Concrete slab | 15mm thick, 1177mm2820mm cement modified board, 5pcs | |||||
Floor decoration | Floor leather | 1.6mm thick plastic floor, 1set | |||||
Interior decoration | Skirting line | 3set | |||||
Internal Angle line | Color steel Yin Angle line, white gray, 4set | ||||||
Auxiliary material | Auxiliary material | Screws, sealant, 1set | |||||
Electrical distribution | Electrical distribution | Industrial socket+industrial socket *1 set, distribution box J-6*1 set, leakage protection (32A) *1 set, five-hole 10A*2, three-hole 16A*1 set, switch *1, LED strip light *2 | |||||
Door | High-grade steel doors | Steel door set, size ≥W925mm*H1970mm with lock and lock core (75 jack), 1set | |||||
Windows | Plastic steel window | Plastic steel window,size≥W925*H1100mm double glass double push(75jack), 2set | |||||
Shingle | Double-sided 0.3 | Color steel composite plate thickness 75mm, color steel plate thickness 0.3mm, deviation ±0.03, PE coating, the outer plate orange peel, the inner plate is flat; Rock wool 50kg/m³, side steel strip, 1set |
1. Do you provide on-site installation service?
We provide very detailed installation instrution drawings and videos for every project. For large projects, we will have both installation workers and supervisiors on site. The fee for the on-site service should be negotiated with clients.
2.What's your delivery time?
Normally, delivery time is 15 days after deposit received. For large order, the delivery time should be negotiated.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution. b. quality of the raw material: choose the qualified raw material c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, the service life of container house steel frame is 20 years